Construction has begun on the David
Allan Hubbard Library, which will incorporate a remodeled and redesigned
McAlister Library. Named for past Fuller Theological Seminary
president David Allan Hubbard, the building will greatly enhance the
ability of the library to serve students, faculty and guests. It
will allow Fuller to more than double the collection of books and other
media, augment essential archives, and offer the study space and
technological capabilities the Fuller community desperately needs.
Most important, the Hubbard Library will respond to a changing world by
documenting the history and movement of evangelical thought, with an
emphasis on the voices of developing evangelical churches in the
Two-Thirds World. See more
photos. |
| |
|
“We want it to be a ‘library of
the future’—a center that offers a way of connecting us with the global
Christian community, and of connecting the global Christian community to
us.”
President Richard J. Mouw |
“President Hubbard embraced some
revolutionary ideas that have forever changed us; may we never walk past this building without
remembering, with gratitude, who David Allan Hubbard was.”
Trustee Jody Vanderwel |
“One of our trustees has said that
David Allan Hubbard was a man of 'unlimited peripheral vision'—and we
believe this library will be a place of unlimited peripheral vision.”
Associate Provost for Library Services David Bundy |
| |
|
Timeline of Construction Progress
|
| November 20, 2006 |
The Pasadena City Council approves the Fuller Theological
Seminary Pasadena campus master plan, including the location for the
Hubbard Library. It will extend south from the present
building to Union Street.
News Release |
| May 21, 2007 |
Ground Breaking Ceremony.
News Release |
| August 16, 23, 2007 |
Existing building moved from construction site. |
| September 2007 |
Installation of underground electrical infrastructure.
"A new library for Fuller
Theological Seminary" by Howard Wilson, the Semi, Sept. 24, 2007 |
| November 2007 |
Electricity re-routed.
Perimeter supports placed in ground, preparing for the excavation of
the basement. |
| December 2007 |
Basement dug down two stories. Cement steps removed from
south side of existing building with jack hammers. |
| February 2008 |
Reinforced concrete foundation poured. |
| March-April 2008 |
Concrete floors, walls, and columns for basements and ground
floor poured. |
| |
|
|
|